TK1306-Klenk-Baruth-2020-bearb

Project Binderholz Baruth - dry kilns 1306 PRO

Further extension of drying capacity

At the beginning of 2019 the first dry kilns 1306 PRO for Binderholz Oberrot | Baruth GmbH (formerly Klenk Holz) were put into operation in Baruth (Germany). Since then, the drying capacity has been readjusted to the production volume and now further eight dry kilns 1306 PRO followed.

In addition, four existing dry kilns have been upgraded to the Mühlböck K5 control system.